DS-105

Corrosion Resistant (304) Stainless Steel

PVD FINISHES

PVD Finish Notes

*Satin Brass, Graphite Black, Satin Black: Lead time 6-8 weeks

*Polished Rose Gold, Satin Rose Gold, Titanium Gold, Dark Chocolate: Lead time 10 weeks

Item Projection (mm/inch) Diameter (mm/inch)
DS105 41 (1.61”) 42 (1.65”)

Tip:  Rubber